US Bridges

T 32 over Chetamba Creek

Good

Renville County, Minnesota · 0.7 MI W of JCT Csah 6 · Structure no. 65572

Built
2020
5 years old
Condition
Good
inspected September 2024
Type
Slab
Concrete Continuous
Length
94 ft
3 main spans
Daily traffic
52
2019 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

T 32 over Chetamba Creek is a concrete continuous slab carrying T 32 over Chetamba Creek in Renville County, Minnesota. It was built in 2020, so it is 5 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 52 vehicles a day, projected to reach 52 by 2039. The structure is 94 ft (28.7 m) long and 35 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesT 32
CrossesChetamba Creek
Location0.7 MI W of JCT Csah 6
RouteCounty Highway 32
Coordinates44.84722, -95.23351
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61.8 US tons
Inventory rating47.5 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length94 ft (28.7 m)
Longest span35 ft (10.7 m)
Deck width35 ft (10.7 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic52 (2019)
Projected traffic52 by 2039
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was T 32 over Chetamba Creek built?

It was built in 2020, making it 5 years old in 2025.

What condition is T 32 over Chetamba Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does T 32 over Chetamba Creek carry?

About 52 vehicles per day (2019 count).

How long is T 32 over Chetamba Creek?

The structure is 94 ft (28.7 m) long with a longest span of 35 ft (10.7 m) and a deck 35 ft wide.

Who owns T 32 over Chetamba Creek?

It is owned by the Town or Township Highway Agency.