T 119 over Jud Ditch # 22
GoodRedwood County, Minnesota · 1.1 MI W of JCT Csah 8 · Structure no. 97505
- Built
- 1994
- 31 years old
- Condition
- Good
- inspected November 2022
- Type
- Culvert
- Concrete
- Length
- 22 ft
- 2 main spans
- Daily traffic
- 97
- 1993 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
T 119 over Jud Ditch # 22 is a concrete culvert carrying T 119 over Jud Ditch # 22 in Redwood County, Minnesota. It was built in 1994, so it is 31 years old, younger than the Minnesota average of 38.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 97 vehicles a day, projected to reach 97 by 2029. The structure is 22 ft (6.6 m) long.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was T 119 over Jud Ditch # 22 built?
It was built in 1994, making it 31 years old in 2025.
What condition is T 119 over Jud Ditch # 22 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2022.
How much traffic does T 119 over Jud Ditch # 22 carry?
About 97 vehicles per day (1993 count).
How long is T 119 over Jud Ditch # 22?
The structure is 22 ft (6.6 m) long with a longest span of 8 ft (2.4 m).
Who owns T 119 over Jud Ditch # 22?
It is owned by the Town or Township Highway Agency.