US Bridges

T 64 over Clear Creek

Good

Redwood County, Minnesota · 0.8 MI E of JCT Csah 7 · Structure no. 64563

Built
2000
25 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
72 ft
1 main span
Daily traffic
82
1999 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

T 64 over Clear Creek is a prestressed concrete stringer/multi-beam or girder carrying T 64 over Clear Creek in Redwood County, Minnesota. It was built in 2000, so it is 25 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 82 vehicles a day, projected to reach 82 by 2029. The structure is 72 ft (21.8 m) long and 34 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesT 64
CrossesClear Creek
Location0.8 MI E of JCT Csah 7
RouteCounty Highway 64
Coordinates44.4724, -95.31741
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75.7 US tons
Inventory rating44.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length72 ft (21.8 m)
Longest span67 ft (20.5 m)
Deck width34 ft (10.5 m)
Roadway width31 ft (9.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic82 (1999)
Projected traffic82 by 2029
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was T 64 over Clear Creek built?

It was built in 2000, making it 25 years old in 2025.

What condition is T 64 over Clear Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does T 64 over Clear Creek carry?

About 82 vehicles per day (1999 count).

How long is T 64 over Clear Creek?

The structure is 72 ft (21.8 m) long with a longest span of 67 ft (20.5 m) and a deck 34 ft wide.

Who owns T 64 over Clear Creek?

It is owned by the Town or Township Highway Agency.