US Bridges

Csah 22 over Gervais Creek

Good

Ramsey County, Minnesota · 0.2 MI NE of JCT Csah 58 · Structure no. 62J21

Built
2021
4 years old
Condition
Good
inspected October 2023
Type
Culvert
Concrete
Length
36 ft
2 main spans
Daily traffic
1,552
2022 count
Owner
County
County Highway Agency

About this bridge

Csah 22 over Gervais Creek is a concrete culvert carrying Csah 22 over Gervais Creek in Ramsey County, Minnesota. It was built in 2021, so it is 4 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,552 vehicles a day, projected to reach 1,600 by 2042. The structure is 36 ft (11 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCsah 22
CrossesGervais Creek
Location0.2 MI NE of JCT Csah 58
RouteCounty Highway 22
Coordinates45.02366, -93.07464
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert9 ExcellentNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHL 93
Structure length36 ft (11 m)
Longest span16 ft (5 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,552 (2022)
Projected traffic1,600 by 2042
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Csah 22 over Gervais Creek built?

It was built in 2021, making it 4 years old in 2025.

What condition is Csah 22 over Gervais Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Csah 22 over Gervais Creek carry?

About 1,552 vehicles per day (2022 count).

How long is Csah 22 over Gervais Creek?

The structure is 36 ft (11 m) long with a longest span of 16 ft (5 m).

Who owns Csah 22 over Gervais Creek?

It is owned by the County Highway Agency.