US Bridges

Csah 65 over Gold Line Brt

Good

Ramsey County, Minnesota · 2.0 MI W of JCT I94 & 120 · Structure no. 62661

Built
2024
1 years old
Condition
Good
inspected November 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
49 ft
1 main span
Daily traffic
18,400
2018 count
Owner
Local
Other Local Agency

About this bridge

Csah 65 over Gold Line Brt is a prestressed concrete stringer/multi-beam or girder carrying Csah 65 over Gold Line Brt in Ramsey County, Minnesota. It was built in 2024, so it is 1 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18,400 vehicles a day, projected to reach 18,400 by 2038. The structure is 49 ft (14.9 m) long and 98 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCsah 65
CrossesGold Line Brt
Location2.0 MI W of JCT I94 & 120
RouteCounty Highway 65
Coordinates44.95164, -93.02525
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating93.9 US tons
Inventory rating41.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length49 ft (14.9 m)
Longest span45 ft (13.8 m)
Deck width98 ft (29.9 m)
Roadway width55 ft (16.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,400 (2018)
Projected traffic18,400 by 2038
Trucks—
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Csah 65 over Gold Line Brt built?

It was built in 2024, making it 1 years old in 2025.

What condition is Csah 65 over Gold Line Brt in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Csah 65 over Gold Line Brt carry?

About 18,400 vehicles per day (2018 count).

How long is Csah 65 over Gold Line Brt?

The structure is 49 ft (14.9 m) long with a longest span of 45 ft (13.8 m) and a deck 98 ft wide.

Who owns Csah 65 over Gold Line Brt?

It is owned by the Other Local Agency.