US Bridges

Pvt 659 over Allianz Stadium Dock

Good

Ramsey County, Minnesota · 0.2 MI NE of JCT 94;TH 51 · Structure no. 62659

Built
2018
7 years old
Condition
Good
inspected April 2023
Type
Frame
Concrete Continuous
Length
91 ft
2 main spans
Daily traffic
1
2019 count
Owner
City
City or Municipal Highway Agency

About this bridge

Pvt 659 over Allianz Stadium Dock is a concrete continuous frame carrying Pvt 659 over Allianz Stadium Dock in Ramsey County, Minnesota. It was built in 2018, so it is 7 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1 vehicles a day, projected to reach 1 by 2039. The structure is 91 ft (27.6 m) long and 49 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPvt 659
CrossesAllianz Stadium Dock
Location0.2 MI NE of JCT 94;TH 51
Coordinates44.95249, -93.16358
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57.5 US tons
Inventory rating44.3 US tons

Structure

Structure typeFrame
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length91 ft (27.6 m)
Longest span50 ft (15.2 m)
Deck width49 ft (14.8 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deck14 ft (4.1 m)

Traffic and service

Average daily traffic1 (2019)
Projected traffic1 by 2039
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesOther
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pvt 659 over Allianz Stadium Dock built?

It was built in 2018, making it 7 years old in 2025.

What condition is Pvt 659 over Allianz Stadium Dock in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does Pvt 659 over Allianz Stadium Dock carry?

About 1 vehicles per day (2019 count).

How long is Pvt 659 over Allianz Stadium Dock?

The structure is 91 ft (27.6 m) long with a longest span of 50 ft (15.2 m) and a deck 49 ft wide.

Who owns Pvt 659 over Allianz Stadium Dock?

It is owned by the City or Municipal Highway Agency.