US Bridges

Msas 151 over Phalen/Keller Rvr; Trl

Good

Ramsey County, Minnesota · 0.3 MI E of JCT TH61 · Structure no. 62643

Built
2011
14 years old
Condition
Good
inspected November 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
110 ft
1 main span
Daily traffic
5,122
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Msas 151 over Phalen/Keller Rvr; Trl is a prestressed concrete stringer/multi-beam or girder carrying Msas 151 over Phalen/Keller Rvr; Trl in Ramsey County, Minnesota. It was built in 2011, so it is 14 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,122 vehicles a day, projected to reach 7,300 by 2041. The structure is 110 ft (33.5 m) long and 51 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesMsas 151
CrossesPhalen/Keller Rvr; Trl
Location0.3 MI E of JCT TH61
RouteCity Street 151
Coordinates44.99733, -93.06255
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating50 US tons
Inventory rating39.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length110 ft (33.5 m)
Longest span110 ft (33.5 m)
Deck width51 ft (15.5 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,122 (2021)
Projected traffic7,300 by 2041
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Msas 151 over Phalen/Keller Rvr; Trl built?

It was built in 2011, making it 14 years old in 2025.

What condition is Msas 151 over Phalen/Keller Rvr; Trl in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Msas 151 over Phalen/Keller Rvr; Trl carry?

About 5,122 vehicles per day (2021 count).

How long is Msas 151 over Phalen/Keller Rvr; Trl?

The structure is 110 ft (33.5 m) long with a longest span of 110 ft (33.5 m) and a deck 51 ft wide.

Who owns Msas 151 over Phalen/Keller Rvr; Trl?

It is owned by the City or Municipal Highway Agency.