M 2074 over Ravine
GoodPosted for loadRamsey County, Minnesota · 0.1 MI S of Summit Ave · Structure no. 62549
- Built
- 1987
- 38 years old
- Condition
- Good
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 86 ft
- 1 main span
- Daily traffic
- 4,075
- 2005 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
M 2074 over Ravine is a prestressed concrete stringer/multi-beam or girder carrying M 2074 over Ravine in Ramsey County, Minnesota. It was built in 1987, so it is 38 years old, younger than the Minnesota average of 38.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 4,075 vehicles a day, roughly 2% of them trucks, projected to reach 4,075 by 2029. The structure is 86 ft (26.3 m) long and 55 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was M 2074 over Ravine built?
It was built in 1987, making it 38 years old in 2025.
What condition is M 2074 over Ravine in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does M 2074 over Ravine carry?
About 4,075 vehicles per day (2005 count), of which roughly 2% are trucks.
How long is M 2074 over Ravine?
The structure is 86 ft (26.3 m) long with a longest span of 80 ft (24.4 m) and a deck 55 ft wide.
Who owns M 2074 over Ravine?
It is owned by the City or Municipal Highway Agency.