US Bridges

Csah 64 over Grand Marais

Good

Polk County, Minnesota · 1.5MI S of JCT Csah 22 · Structure no. 60563

Built
2013
12 years old
Condition
Good
inspected October 2021
Type
Culvert
Concrete
Length
46 ft
3 main spans
Daily traffic
43
2021 count
Owner
County
County Highway Agency

About this bridge

Csah 64 over Grand Marais is a concrete culvert carrying Csah 64 over Grand Marais in Polk County, Minnesota. It was built in 2013, so it is 12 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 43 vehicles a day, projected to reach 45 by 2041. The structure is 46 ft (13.9 m) long. If it were closed, the detour would be 6.2 mi (10 km).

CarriesCsah 64
CrossesGrand Marais
Location1.5MI S of JCT Csah 22
RouteCounty Highway 64
Coordinates48.05684, -97.06259
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert8 Very GoodNo problems noted.
Last inspectionOctober 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHL 93
Structure length46 ft (13.9 m)
Longest span14 ft (4.3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic43 (2021)
Projected traffic45 by 2041
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Csah 64 over Grand Marais built?

It was built in 2013, making it 12 years old in 2025.

What condition is Csah 64 over Grand Marais in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2021.

How much traffic does Csah 64 over Grand Marais carry?

About 43 vehicles per day (2021 count).

How long is Csah 64 over Grand Marais?

The structure is 46 ft (13.9 m) long with a longest span of 14 ft (4.3 m).

Who owns Csah 64 over Grand Marais?

It is owned by the County Highway Agency.