US Bridges

T 267 over E Br Rock River

Good

Pipestone County, Minnesota · 2.5 MI W of JCT Csah 18 · Structure no. 59528

Built
2008
17 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
81 ft
1 main span
Daily traffic
44
2007 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

T 267 over E Br Rock River is a prestressed concrete stringer/multi-beam or girder carrying T 267 over E Br Rock River in Pipestone County, Minnesota. It was built in 2008, so it is 17 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 44 vehicles a day, projected to reach 44 by 2029. The structure is 81 ft (24.8 m) long and 31 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesT 267
CrossesE Br Rock River
Location2.5 MI W of JCT Csah 18
RouteCounty Highway 267
Coordinates44.00826, -96.15463
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating83.4 US tons
Inventory rating49.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length81 ft (24.8 m)
Longest span80 ft (24.3 m)
Deck width31 ft (9.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic44 (2007)
Projected traffic44 by 2029
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was T 267 over E Br Rock River built?

It was built in 2008, making it 17 years old in 2025.

What condition is T 267 over E Br Rock River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does T 267 over E Br Rock River carry?

About 44 vehicles per day (2007 count).

How long is T 267 over E Br Rock River?

The structure is 81 ft (24.8 m) long with a longest span of 80 ft (24.3 m) and a deck 31 ft wide.

Who owns T 267 over E Br Rock River?

It is owned by the Town or Township Highway Agency.