US Bridges

M 3 over Schwerin Creek

PoorPosted for load

Mower County, Minnesota · 0.4 MI W of JCT Csah 7 · Structure no. L4980

Built
1936
89 years old
Condition
Poor
inspected September 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
24 ft
1 main span
Daily traffic
50
1986 count
Owner
County
County Highway Agency

About this bridge

M 3 over Schwerin Creek is a steel stringer/multi-beam or girder carrying M 3 over Schwerin Creek in Mower County, Minnesota. It was built in 1936, so it is 89 years old, older than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.

It carries about 50 vehicles a day, projected to reach 50 by 2029. The structure is 24 ft (7.3 m) long and 25 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesM 3
CrossesSchwerin Creek
Location0.4 MI W of JCT Csah 7
RouteCity Street 3
Coordinates43.65936, -92.71824
Functional classRural Local

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2024
Inspection intervalevery 12 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating28.4 US tons
Inventory rating16.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length24 ft (7.3 m)
Longest span21 ft (6.4 m)
Deck width25 ft (7.6 m)
Roadway width25 ft (7.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (1986)
Projected traffic50 by 2029
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$214.2 million (2023 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was M 3 over Schwerin Creek built?

It was built in 1936, making it 89 years old in 2025.

What condition is M 3 over Schwerin Creek in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in September 2024.

How much traffic does M 3 over Schwerin Creek carry?

About 50 vehicles per day (1986 count).

How long is M 3 over Schwerin Creek?

The structure is 24 ft (7.3 m) long with a longest span of 21 ft (6.4 m) and a deck 25 ft wide.

Who owns M 3 over Schwerin Creek?

It is owned by the County Highway Agency.