T 12 over Jud Ditch # 1
GoodMower County, Minnesota · 0.7 MI W of JCT Csah 14 · Structure no. 50K57
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected July 2022
- Type
- Culvert
- Concrete
- Length
- 33 ft
- 2 main spans
- Daily traffic
- 49
- 2017 count
- Owner
- County
- County Highway Agency
About this bridge
T 12 over Jud Ditch # 1 is a concrete culvert carrying T 12 over Jud Ditch # 1 in Mower County, Minnesota. It was built in 2018, so it is 7 years old, younger than the Minnesota average of 38.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 49 vehicles a day, projected to reach 49 by 2037. The structure is 33 ft (10 m) long. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was T 12 over Jud Ditch # 1 built?
It was built in 2018, making it 7 years old in 2025.
What condition is T 12 over Jud Ditch # 1 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2022.
How much traffic does T 12 over Jud Ditch # 1 carry?
About 49 vehicles per day (2017 count).
How long is T 12 over Jud Ditch # 1?
The structure is 33 ft (10 m) long with a longest span of 14 ft (4.3 m).
Who owns T 12 over Jud Ditch # 1?
It is owned by the County Highway Agency.