US Bridges

T 141 over Two Rivers

Good

Morrison County, Minnesota · 0.1 MI S of JCT TH 238 · Structure no. 49J99

Built
2021
4 years old
Condition
Good
inspected November 2021
Type
Culvert
Concrete
Length
30 ft
2 main spans
Daily traffic
50
2021 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

T 141 over Two Rivers is a concrete culvert carrying T 141 over Two Rivers in Morrison County, Minnesota. It was built in 2021, so it is 4 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 60 by 2041. The structure is 30 ft (9.1 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesT 141
CrossesTwo Rivers
Location0.1 MI S of JCT TH 238
RouteCounty Highway 141
Coordinates45.83256, -94.45182
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert9 ExcellentNo problems noted.
Last inspectionNovember 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHL 93
Structure length30 ft (9.1 m)
Longest span14 ft (4.2 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2021)
Projected traffic60 by 2041
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was T 141 over Two Rivers built?

It was built in 2021, making it 4 years old in 2025.

What condition is T 141 over Two Rivers in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2021.

How much traffic does T 141 over Two Rivers carry?

About 50 vehicles per day (2021 count).

How long is T 141 over Two Rivers?

The structure is 30 ft (9.1 m) long with a longest span of 14 ft (4.2 m).

Who owns T 141 over Two Rivers?

It is owned by the Town or Township Highway Agency.