US Bridges

T 211 over North Fork Crow River

Good

Meeker County, Minnesota · 0.9 MI N of JCT Csah 3 · Structure no. 47537

Built
2024
1 years old
Condition
Good
inspected January 2025
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
194 ft
3 main spans
Daily traffic
49
2024 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

T 211 over North Fork Crow River is a prestressed concrete stringer/multi-beam or girder carrying T 211 over North Fork Crow River in Meeker County, Minnesota. It was built in 2024, so it is 1 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 49 vehicles a day, projected to reach 49 by 2044. The structure is 194 ft (59 m) long and 31 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesT 211
CrossesNorth Fork Crow River
Location0.9 MI N of JCT Csah 3
RouteCounty Highway 211
Coordinates45.25897, -94.57756
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation9: Superior to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51 US tons
Inventory rating39.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length194 ft (59 m)
Longest span66 ft (20.2 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic49 (2024)
Projected traffic49 by 2044
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was T 211 over North Fork Crow River built?

It was built in 2024, making it 1 years old in 2025.

What condition is T 211 over North Fork Crow River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does T 211 over North Fork Crow River carry?

About 49 vehicles per day (2024 count).

How long is T 211 over North Fork Crow River?

The structure is 194 ft (59 m) long with a longest span of 66 ft (20.2 m) and a deck 31 ft wide.

Who owns T 211 over North Fork Crow River?

It is owned by the Town or Township Highway Agency and maintained by the County Highway Agency.