US Bridges

Csah 41 over I 90

Fair

Martin County, Minnesota · 0.7 MI W of JCT TH 15 · Structure no. 46829

Built
1973
52 years old
Condition
Fair
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
308 ft
4 main spans
Daily traffic
1,147
2022 count
Owner
State
State Highway Agency

About this bridge

Csah 41 over I 90 is a prestressed concrete stringer/multi-beam or girder carrying Csah 41 over I 90 in Martin County, Minnesota. It was built in 1973, so it is 52 years old, older than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,147 vehicles a day, projected to reach 1,050 by 2042. The structure is 308 ft (93.8 m) long and 40 ft wide.

CarriesCsah 41
CrossesI 90
Location0.7 MI W of JCT TH 15
RouteCounty Highway 41
Coordinates43.67925, -94.4622
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57.4 US tons
Inventory rating28.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length308 ft (93.8 m)
Longest span86 ft (26.1 m)
Deck width40 ft (12.1 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,147 (2022)
Projected traffic1,050 by 2042
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Csah 41 over I 90 built?

It was built in 1973, making it 52 years old in 2025.

What condition is Csah 41 over I 90 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does Csah 41 over I 90 carry?

About 1,147 vehicles per day (2022 count).

How long is Csah 41 over I 90?

The structure is 308 ft (93.8 m) long with a longest span of 86 ft (26.1 m) and a deck 40 ft wide.

Who owns Csah 41 over I 90?

It is owned by the State Highway Agency.