US 75 over Swift Coulee
FairMarshall County, Minnesota · 6.0 MI N of JCT Mn 1 · Structure no. 45X04
- Built
- 2007
- 18 years old
- Condition
- Fair
- inspected August 2021
- Type
- Culvert
- Concrete
- Length
- 48 ft
- 3 main spans
- Daily traffic
- 1,200
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
US 75 over Swift Coulee is a concrete culvert carrying US 75 over Swift Coulee in Marshall County, Minnesota. It was built in 2007, so it is 18 years old, younger than the Minnesota average of 38.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,200 vehicles a day, roughly 19% of them trucks, projected to reach 1,050 by 2038. The structure is 48 ft (14.6 m) long.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 8 Very Good | No problems noted. |
| Culvert | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 75 over Swift Coulee built?
It was built in 2007, making it 18 years old in 2025.
What condition is US 75 over Swift Coulee in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2021.
How much traffic does US 75 over Swift Coulee carry?
About 1,200 vehicles per day (2018 count), of which roughly 19% are trucks.
How long is US 75 over Swift Coulee?
The structure is 48 ft (14.6 m) long with a longest span of 13 ft (4 m).
Who owns US 75 over Swift Coulee?
It is owned by the State Highway Agency.