US Bridges

T 207 over Buffalo Creek

Good

McLeod County, Minnesota · 0.1 MI S of JCT TH 212 · Structure no. 43561

Built
2017
8 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
160 ft
3 main spans
Daily traffic
80
2016 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

T 207 over Buffalo Creek is a prestressed concrete stringer/multi-beam or girder carrying T 207 over Buffalo Creek in McLeod County, Minnesota. It was built in 2017, so it is 8 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 80 vehicles a day, projected to reach 80 by 2036. The structure is 160 ft (48.9 m) long and 35 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesT 207
CrossesBuffalo Creek
Location0.1 MI S of JCT TH 212
RouteCounty Highway 207
Coordinates44.75248, -94.1726
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating73.2 US tons
Inventory rating40.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length160 ft (48.9 m)
Longest span78 ft (23.8 m)
Deck width35 ft (10.8 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic80 (2016)
Projected traffic80 by 2036
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was T 207 over Buffalo Creek built?

It was built in 2017, making it 8 years old in 2025.

What condition is T 207 over Buffalo Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does T 207 over Buffalo Creek carry?

About 80 vehicles per day (2016 count).

How long is T 207 over Buffalo Creek?

The structure is 160 ft (48.9 m) long with a longest span of 78 ft (23.8 m) and a deck 35 ft wide.

Who owns T 207 over Buffalo Creek?

It is owned by the Town or Township Highway Agency.