US Bridges

Msas 108 over S Fk Crow River

Fair

McLeod County, Minnesota · 0.7 M E of JCT TH 15 · Structure no. 43532

Built
1998
27 years old
Condition
Fair
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
455 ft
4 main spans
Daily traffic
3,850
2017 count
Owner
City
City or Municipal Highway Agency

About this bridge

Msas 108 over S Fk Crow River is a prestressed concrete stringer/multi-beam or girder carrying Msas 108 over S Fk Crow River in McLeod County, Minnesota. It was built in 1998, so it is 27 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 3,850 vehicles a day, projected to reach 3,850 by 2039. The structure is 455 ft (138.8 m) long and 54 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesMsas 108
CrossesS Fk Crow River
Location0.7 M E of JCT TH 15
RouteCity Street 108
Coordinates44.88693, -94.35673
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating83 US tons
Inventory rating39.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 25 or greater
Structure length455 ft (138.8 m)
Longest span113 ft (34.5 m)
Deck width54 ft (16.4 m)
Roadway width44 ft (13.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,850 (2017)
Projected traffic3,850 by 2039
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Msas 108 over S Fk Crow River built?

It was built in 1998, making it 27 years old in 2025.

What condition is Msas 108 over S Fk Crow River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does Msas 108 over S Fk Crow River carry?

About 3,850 vehicles per day (2017 count).

How long is Msas 108 over S Fk Crow River?

The structure is 455 ft (138.8 m) long with a longest span of 113 ft (34.5 m) and a deck 54 ft wide.

Who owns Msas 108 over S Fk Crow River?

It is owned by the City or Municipal Highway Agency.