Mn 61 over Silver Creek; Pedestrian
GoodLake County, Minnesota · 3.9 MI NE of JCT Csah 2 · Structure no. 38017
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 145 ft
- 1 main span
- Daily traffic
- 6,474
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Mn 61 over Silver Creek; Pedestrian is a prestressed concrete stringer/multi-beam or girder carrying Mn 61 over Silver Creek; Pedestrian in Lake County, Minnesota. It was built in 2022, so it is 3 years old, younger than the Minnesota average of 38.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 6,474 vehicles a day, roughly 7% of them trucks, projected to reach 6,720 by 2042. The structure is 145 ft (44.3 m) long and 57 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Mn 61 over Silver Creek; Pedestrian built?
It was built in 2022, making it 3 years old in 2025.
What condition is Mn 61 over Silver Creek; Pedestrian in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does Mn 61 over Silver Creek; Pedestrian carry?
About 6,474 vehicles per day (2022 count), of which roughly 7% are trucks.
How long is Mn 61 over Silver Creek; Pedestrian?
The structure is 145 ft (44.3 m) long with a longest span of 140 ft (42.6 m) and a deck 57 ft wide.
Who owns Mn 61 over Silver Creek; Pedestrian?
It is owned by the State Highway Agency.