T 153 over Ditch
GoodLac qui Parle County, Minnesota · 1.25 MI NE of Boyd · Structure no. 37J85
- Built
- 2019
- 6 years old
- Condition
- Good
- inspected October 2023
- Type
- Culvert
- Concrete
- Length
- 30 ft
- 2 main spans
- Daily traffic
- 49
- 2019 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
T 153 over Ditch is a concrete culvert carrying T 153 over Ditch in Lac qui Parle County, Minnesota. It was built in 2019, so it is 6 years old, younger than the Minnesota average of 38.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 49 vehicles a day, projected to reach 49 by 2039. The structure is 30 ft (9.1 m) long. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 9 Excellent | No problems noted. |
| Culvert | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was T 153 over Ditch built?
It was built in 2019, making it 6 years old in 2025.
What condition is T 153 over Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does T 153 over Ditch carry?
About 49 vehicles per day (2019 count).
How long is T 153 over Ditch?
The structure is 30 ft (9.1 m) long with a longest span of 14 ft (4.3 m).
Who owns T 153 over Ditch?
It is owned by the Town or Township Highway Agency.