T 294 over S Br Two Rivers
GoodKittson County, Minnesota · 1.4 MI E of JCT TH 75 · Structure no. 35518
- Built
- 1982
- 43 years old
- Condition
- Good
- inspected October 2024
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 159 ft
- 2 main spans
- Daily traffic
- 40
- 1991 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
T 294 over S Br Two Rivers is a prestressed concrete tee beam carrying T 294 over S Br Two Rivers in Kittson County, Minnesota. It was built in 1982, so it is 43 years old, older than the Minnesota average of 38.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 40 vehicles a day, projected to reach 40 by 2029. The structure is 159 ft (48.5 m) long and 30 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was T 294 over S Br Two Rivers built?
It was built in 1982, making it 43 years old in 2025.
What condition is T 294 over S Br Two Rivers in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does T 294 over S Br Two Rivers carry?
About 40 vehicles per day (1991 count).
How long is T 294 over S Br Two Rivers?
The structure is 159 ft (48.5 m) long with a longest span of 78 ft (23.7 m) and a deck 30 ft wide.
Who owns T 294 over S Br Two Rivers?
It is owned by the Town or Township Highway Agency.