US Bridges

CR 119 over Ditch

Good

Kandiyohi County, Minnesota · 0.5 MI W of JCT Csah 3 · Structure no. 34J54

Built
2023
2 years old
Condition
Good
inspected October 2024
Type
Culvert
Concrete
Length
31 ft
2 main spans
Daily traffic
140
2024 count
Owner
County
County Highway Agency

About this bridge

CR 119 over Ditch is a concrete culvert carrying CR 119 over Ditch in Kandiyohi County, Minnesota. It was built in 2023, so it is 2 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 140 vehicles a day, projected to reach 190 by 2044. The structure is 31 ft (9.3 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCR 119
CrossesDitch
Location0.5 MI W of JCT Csah 3
RouteCounty Highway 119
Coordinates45.04861, -94.98039
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHL 93
Structure length31 ft (9.3 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic140 (2024)
Projected traffic190 by 2044
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 119 over Ditch built?

It was built in 2023, making it 2 years old in 2025.

What condition is CR 119 over Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does CR 119 over Ditch carry?

About 140 vehicles per day (2024 count).

How long is CR 119 over Ditch?

The structure is 31 ft (9.3 m) long with a longest span of 12 ft (3.7 m).

Who owns CR 119 over Ditch?

It is owned by the County Highway Agency.