US Bridges

T 209 over Jud Ditch # 13

Good

Jackson County, Minnesota · 0.1 MI S of JCT CR 68 · Structure no. 95022

Built
1979
46 years old
Condition
Good
inspected October 2021
Type
Culvert
Concrete
Length
53 ft
3 main spans
Daily traffic
25
1988 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

T 209 over Jud Ditch # 13 is a concrete culvert carrying T 209 over Jud Ditch # 13 in Jackson County, Minnesota. It was built in 1979, so it is 46 years old, older than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 25 vehicles a day, projected to reach 25 by 2029. The structure is 53 ft (16.2 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesT 209
CrossesJud Ditch # 13
Location0.1 MI S of JCT CR 68
RouteCounty Highway 209
Coordinates43.58505, -95.39484
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert8 Very GoodNo problems noted.
Last inspectionOctober 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.4 US tons
Inventory rating39.6 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length53 ft (16.2 m)
Longest span13 ft (4.1 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25 (1988)
Projected traffic25 by 2029
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$112 million
NavigationNo navigation control on waterway

Frequently asked questions

When was T 209 over Jud Ditch # 13 built?

It was built in 1979, making it 46 years old in 2025.

What condition is T 209 over Jud Ditch # 13 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2021.

How much traffic does T 209 over Jud Ditch # 13 carry?

About 25 vehicles per day (1988 count).

How long is T 209 over Jud Ditch # 13?

The structure is 53 ft (16.2 m) long with a longest span of 13 ft (4.1 m).

Who owns T 209 over Jud Ditch # 13?

It is owned by the Town or Township Highway Agency.