M 30 over Mesabi Trail
FairPosted for loadItasca County, Minnesota · In Coleraine · Structure no. 5293
- Built
- 1918
- 107 years old
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 32 ft
- 1 main span
- Daily traffic
- 8,600
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
M 30 over Mesabi Trail is a steel stringer/multi-beam or girder carrying M 30 over Mesabi Trail in Itasca County, Minnesota. It was built in 1918, so it is 107 years old, older than the Minnesota average of 38.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 8,600 vehicles a day, projected to reach 8,600 by 2039. The structure is 32 ft (9.7 m) long and 32 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was M 30 over Mesabi Trail built?
It was built in 1918, making it 107 years old in 2025.
What condition is M 30 over Mesabi Trail in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does M 30 over Mesabi Trail carry?
About 8,600 vehicles per day (2017 count).
How long is M 30 over Mesabi Trail?
The structure is 32 ft (9.7 m) long with a longest span of 27 ft (8.2 m) and a deck 32 ft wide.
Who owns M 30 over Mesabi Trail?
It is owned by the City or Municipal Highway Agency.