US Bridges

Ar 8 over Northwest DR

Good

Hennepin County, Minnesota · Msp Intl Airport · Structure no. R0877

Built
2017
8 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
64 ft
1 main span
Daily traffic
43,277
2022 count
Owner
Private
Private (other than railroad)

About this bridge

Ar 8 over Northwest DR is a prestressed concrete stringer/multi-beam or girder carrying Ar 8 over Northwest DR in Hennepin County, Minnesota. It was built in 2017, so it is 8 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 43,277 vehicles a day, roughly 1% of them trucks, projected to reach 34,000 by 2042. The structure is 64 ft (19.6 m) long and 66 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesAr 8
CrossesNorthwest DR
LocationMsp Intl Airport
Coordinates44.87921, -93.19989
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment7: Better than present minimum criteria
Operating rating63.6 US tons
Inventory rating40.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length64 ft (19.6 m)
Longest span53 ft (16.1 m)
Deck width66 ft (20.2 m)
Roadway width63 ft (19.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic43,277 (2022)
Projected traffic34,000 by 2042
Trucks1%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerPrivate (other than railroad)
Maintained byPrivate (other than railroad)
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ar 8 over Northwest DR built?

It was built in 2017, making it 8 years old in 2025.

What condition is Ar 8 over Northwest DR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Ar 8 over Northwest DR carry?

About 43,277 vehicles per day (2022 count), of which roughly 1% are trucks.

How long is Ar 8 over Northwest DR?

The structure is 64 ft (19.6 m) long with a longest span of 53 ft (16.1 m) and a deck 66 ft wide.

Who owns Ar 8 over Northwest DR?

It is owned by the Private (other than railroad).