M 1062 over Midtown Greenway
FairPosted for loadHennepin County, Minnesota · 0.1 MI N of Lake ST · Structure no. L8922
- Built
- 1916
- 109 years old
- Condition
- Fair
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete Continuous
- Length
- 94 ft
- 3 main spans
- Daily traffic
- 1,822
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
M 1062 over Midtown Greenway is a concrete continuous stringer/multi-beam or girder carrying M 1062 over Midtown Greenway in Hennepin County, Minnesota. It was built in 1916, so it is 109 years old, older than the Minnesota average of 38.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 1,822 vehicles a day, projected to reach 1,822 by 2034. The structure is 94 ft (28.8 m) long and 51 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was M 1062 over Midtown Greenway built?
It was built in 1916, making it 109 years old in 2025.
What condition is M 1062 over Midtown Greenway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does M 1062 over Midtown Greenway carry?
About 1,822 vehicles per day (2018 count).
How long is M 1062 over Midtown Greenway?
The structure is 94 ft (28.8 m) long with a longest span of 31 ft (9.6 m) and a deck 51 ft wide.
Who owns M 1062 over Midtown Greenway?
It is owned by the County Highway Agency.