US Bridges

M 75 over Peavey Channel

Fair

Hennepin County, Minnesota · 0.9 MI SE of JCT Csah 15 · Structure no. 27B70

Built
2014
11 years old
Condition
Fair
inspected December 2023
Type
Frame
Concrete
Length
30 ft
1 main span
Daily traffic
400
2013 count
Owner
City
City or Municipal Highway Agency

About this bridge

M 75 over Peavey Channel is a concrete frame carrying M 75 over Peavey Channel in Hennepin County, Minnesota. It was built in 2014, so it is 11 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 400 vehicles a day, projected to reach 400 by 2033. The structure is 30 ft (9 m) long and 28 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesM 75
CrossesPeavey Channel
Location0.9 MI SE of JCT Csah 15
RouteCity Street 75
Coordinates44.96389, -93.53733
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating90.7 US tons
Inventory rating70 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length30 ft (9 m)
Longest span27 ft (8.2 m)
Deck width28 ft (8.6 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic400 (2013)
Projected traffic400 by 2033
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was M 75 over Peavey Channel built?

It was built in 2014, making it 11 years old in 2025.

What condition is M 75 over Peavey Channel in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.

How much traffic does M 75 over Peavey Channel carry?

About 400 vehicles per day (2013 count).

How long is M 75 over Peavey Channel?

The structure is 30 ft (9 m) long with a longest span of 27 ft (8.2 m) and a deck 28 ft wide.

Who owns M 75 over Peavey Channel?

It is owned by the City or Municipal Highway Agency.