M 485 over Ped Culvert
GoodHennepin County, Minnesota · At Harvard ST SE · Structure no. 27B51
- Built
- 1983
- 42 years old
- Condition
- Good
- inspected August 2024
- Type
- Culvert
- Concrete
- Length
- 25 ft
- 1 main span
- Daily traffic
- 4,900
- 2013 count
- Owner
- State
- Other State Agency
About this bridge
M 485 over Ped Culvert is a concrete culvert carrying M 485 over Ped Culvert in Hennepin County, Minnesota. It was built in 1983, so it is 42 years old, older than the Minnesota average of 38.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,900 vehicles a day, projected to reach 300 by 2029. The structure is 25 ft (7.6 m) long. If it were closed, the detour would be 123 mi (198 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Culvert | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was M 485 over Ped Culvert built?
It was built in 1983, making it 42 years old in 2025.
What condition is M 485 over Ped Culvert in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does M 485 over Ped Culvert carry?
About 4,900 vehicles per day (2013 count).
How long is M 485 over Ped Culvert?
The structure is 25 ft (7.6 m) long with a longest span of 25 ft (7.6 m).
Who owns M 485 over Ped Culvert?
It is owned by the Other State Agency.