US Bridges

M 81 over Channel

Good

Hennepin County, Minnesota · To Shady Island · Structure no. 27A34

Built
1997
28 years old
Condition
Good
inspected August 2023
Type
Slab
Wood or Timber
Length
52 ft
3 main spans
Daily traffic
260
1988 count
Owner
City
City or Municipal Highway Agency

About this bridge

M 81 over Channel is a wood or timber slab carrying M 81 over Channel in Hennepin County, Minnesota. It was built in 1997, so it is 28 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 260 vehicles a day, projected to reach 260 by 2029. The structure is 52 ft (15.9 m) long and 24 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesM 81
CrossesChannel
LocationTo Shady Island
RouteCity Street 81
Coordinates44.91199, -93.63635
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating58.6 US tons
Inventory rating42.7 US tons

Structure

Structure typeSlab
MaterialWood or Timber
DeckWood or timber
Main spans3
Design loadHS 25 or greater
Structure length52 ft (15.9 m)
Longest span20 ft (6.1 m)
Deck width24 ft (7.3 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic260 (1988)
Projected traffic260 by 2029
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$128 million
NavigationNo navigation control on waterway

Frequently asked questions

When was M 81 over Channel built?

It was built in 1997, making it 28 years old in 2025.

What condition is M 81 over Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does M 81 over Channel carry?

About 260 vehicles per day (1988 count).

How long is M 81 over Channel?

The structure is 52 ft (15.9 m) long with a longest span of 20 ft (6.1 m) and a deck 24 ft wide.

Who owns M 81 over Channel?

It is owned by the City or Municipal Highway Agency.