US Bridges

Con 5937 over 2nd ST

Good

Hennepin County, Minnesota · 1.2 MI NE JCT I94; I35W · Structure no. 27414

Built
2008
17 years old
Condition
Good
inspected April 2024
Type
Slab
Concrete
Length
76 ft
1 main span
Daily traffic
14,301
2022 count
Owner
State
State Highway Agency

About this bridge

Con 5937 over 2nd ST is a concrete slab carrying Con 5937 over 2nd ST in Hennepin County, Minnesota. It was built in 2008, so it is 17 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 14,301 vehicles a day, roughly 3% of them trucks, projected to reach 77,000 by 2042. The structure is 76 ft (23.2 m) long and 45 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCon 5937
Crosses2nd ST
Location1.2 MI NE JCT I94; I35W
RouteInterstate 5937
Coordinates44.98109, -93.24369
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating87.2 US tons
Inventory rating67.5 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length76 ft (23.2 m)
Longest span76 ft (23.2 m)
Deck width45 ft (13.6 m)
Roadway width41 ft (12.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14,301 (2022)
Projected traffic77,000 by 2042
Trucks3%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Con 5937 over 2nd ST built?

It was built in 2008, making it 17 years old in 2025.

What condition is Con 5937 over 2nd ST in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Con 5937 over 2nd ST carry?

About 14,301 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is Con 5937 over 2nd ST?

The structure is 76 ft (23.2 m) long with a longest span of 76 ft (23.2 m) and a deck 45 ft wide.

Who owns Con 5937 over 2nd ST?

It is owned by the State Highway Agency.