US Bridges

T 75 over Stream

Good

Goodhue County, Minnesota · 0.4 MI E of JCT TH 61 · Structure no. 25617

Built
2015
10 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
67 ft
1 main span
Daily traffic
73
2014 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

T 75 over Stream is a prestressed concrete stringer/multi-beam or girder carrying T 75 over Stream in Goodhue County, Minnesota. It was built in 2015, so it is 10 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 73 vehicles a day, projected to reach 73 by 2032. The structure is 67 ft (20.3 m) long and 31 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesT 75
CrossesStream
Location0.4 MI E of JCT TH 61
RouteCounty Highway 75
Coordinates44.53493, -92.40667
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.2 US tons
Inventory rating37.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length67 ft (20.3 m)
Longest span65 ft (19.7 m)
Deck width31 ft (9.6 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic73 (2014)
Projected traffic73 by 2032
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was T 75 over Stream built?

It was built in 2015, making it 10 years old in 2025.

What condition is T 75 over Stream in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does T 75 over Stream carry?

About 73 vehicles per day (2014 count).

How long is T 75 over Stream?

The structure is 67 ft (20.3 m) long with a longest span of 65 ft (19.7 m) and a deck 31 ft wide.

Who owns T 75 over Stream?

It is owned by the Town or Township Highway Agency.