US Bridges

M 466 over Spring Creek

Good

Goodhue County, Minnesota · 0.3 MI NE of JCT TH 19 · Structure no. 25612

Built
2013
12 years old
Condition
Good
inspected October 2023
Type
Slab
Concrete Continuous
Length
43 ft
1 main span
Daily traffic
18
2011 count
Owner
City
City or Municipal Highway Agency

About this bridge

M 466 over Spring Creek is a concrete continuous slab carrying M 466 over Spring Creek in Goodhue County, Minnesota. It was built in 2013, so it is 12 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18 vehicles a day, projected to reach 27 by 2032. The structure is 43 ft (13.1 m) long and 29 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesM 466
CrossesSpring Creek
Location0.3 MI NE of JCT TH 19
RouteCity Street 466
Coordinates44.54683, -92.65211
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61.1 US tons
Inventory rating47.2 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length43 ft (13.1 m)
Longest span39 ft (11.8 m)
Deck width29 ft (8.9 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18 (2011)
Projected traffic27 by 2032
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was M 466 over Spring Creek built?

It was built in 2013, making it 12 years old in 2025.

What condition is M 466 over Spring Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does M 466 over Spring Creek carry?

About 18 vehicles per day (2011 count).

How long is M 466 over Spring Creek?

The structure is 43 ft (13.1 m) long with a longest span of 39 ft (11.8 m) and a deck 29 ft wide.

Who owns M 466 over Spring Creek?

It is owned by the City or Municipal Highway Agency.