US Bridges

Csah 30 over Pine Creek

Good

Fillmore County, Minnesota · 1.9 MI E of JCT TH 139 · Structure no. 23K63

Built
2022
3 years old
Condition
Good
inspected April 2024
Type
Culvert
Concrete
Length
30 ft
2 main spans
Daily traffic
135
2013 count
Owner
County
County Highway Agency

About this bridge

Csah 30 over Pine Creek is a concrete culvert carrying Csah 30 over Pine Creek in Fillmore County, Minnesota. It was built in 2022, so it is 3 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 135 vehicles a day, projected to reach 153 by 2033. The structure is 30 ft (9.1 m) long. If it were closed, the detour would be 5 mi (8 km).

CarriesCsah 30
CrossesPine Creek
Location1.9 MI E of JCT TH 139
RouteCounty Highway 30
Coordinates43.51514, -91.97168
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHL 93
Structure length30 ft (9.1 m)
Longest span14 ft (4.3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic135 (2013)
Projected traffic153 by 2033
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Csah 30 over Pine Creek built?

It was built in 2022, making it 3 years old in 2025.

What condition is Csah 30 over Pine Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Csah 30 over Pine Creek carry?

About 135 vehicles per day (2013 count).

How long is Csah 30 over Pine Creek?

The structure is 30 ft (9.1 m) long with a longest span of 14 ft (4.3 m).

Who owns Csah 30 over Pine Creek?

It is owned by the County Highway Agency.