US Bridges

T 222 over Mill Pond S Br Root Rvr

Good

Fillmore County, Minnesota · 0.8 MI E of JCT Csah 17 · Structure no. 23536

Built
2018
7 years old
Condition
Good
inspected April 2023
Type
Slab
Concrete Continuous
Length
132 ft
3 main spans
Daily traffic
53
2017 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

T 222 over Mill Pond S Br Root Rvr is a concrete continuous slab carrying T 222 over Mill Pond S Br Root Rvr in Fillmore County, Minnesota. It was built in 2018, so it is 7 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 53 vehicles a day, projected to reach 53 by 2037. The structure is 132 ft (40.1 m) long and 31 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesT 222
CrossesMill Pond S Br Root Rvr
Location0.8 MI E of JCT Csah 17
RouteCounty Highway 222
Coordinates43.70971, -92.03355
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment4: Meets minimum tolerable limits to be left in place as is
Operating rating58.2 US tons
Inventory rating44.6 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length132 ft (40.1 m)
Longest span50 ft (15.2 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic53 (2017)
Projected traffic53 by 2037
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was T 222 over Mill Pond S Br Root Rvr built?

It was built in 2018, making it 7 years old in 2025.

What condition is T 222 over Mill Pond S Br Root Rvr in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does T 222 over Mill Pond S Br Root Rvr carry?

About 53 vehicles per day (2017 count).

How long is T 222 over Mill Pond S Br Root Rvr?

The structure is 132 ft (40.1 m) long with a longest span of 50 ft (15.2 m) and a deck 31 ft wide.

Who owns T 222 over Mill Pond S Br Root Rvr?

It is owned by the Town or Township Highway Agency.