US Bridges

T 323 over Foster Creek

Good

Faribault County, Minnesota · 2.6 MI N of JCT Csah 16 · Structure no. 22J53

Built
2020
5 years old
Condition
Good
inspected November 2024
Type
Culvert
Concrete
Length
40 ft
3 main spans
Daily traffic
88
2020 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

T 323 over Foster Creek is a concrete culvert carrying T 323 over Foster Creek in Faribault County, Minnesota. It was built in 2020, so it is 5 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 88 vehicles a day, projected to reach 88 by 2040. The structure is 40 ft (12.2 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesT 323
CrossesFoster Creek
Location2.6 MI N of JCT Csah 16
RouteCounty Highway 323
Coordinates43.68971, -93.68833
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHL 93
Structure length40 ft (12.2 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic88 (2020)
Projected traffic88 by 2040
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was T 323 over Foster Creek built?

It was built in 2020, making it 5 years old in 2025.

What condition is T 323 over Foster Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does T 323 over Foster Creek carry?

About 88 vehicles per day (2020 count).

How long is T 323 over Foster Creek?

The structure is 40 ft (12.2 m) long with a longest span of 12 ft (3.7 m).

Who owns T 323 over Foster Creek?

It is owned by the Town or Township Highway Agency.