US Bridges

T 110 over Center Creek

Good

Faribault County, Minnesota · 0.8 MI E of JCT Csah 1 · Structure no. 22627

Built
2023
2 years old
Condition
Good
inspected October 2023
Type
Slab
Concrete Continuous
Length
112 ft
3 main spans
Daily traffic
49
2023 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

T 110 over Center Creek is a concrete continuous slab carrying T 110 over Center Creek in Faribault County, Minnesota. It was built in 2023, so it is 2 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 49 vehicles a day, projected to reach 49 by 2043. The structure is 112 ft (34 m) long and 31 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesT 110
CrossesCenter Creek
Location0.8 MI E of JCT Csah 1
RouteCounty Highway 110
Coordinates43.72461, -94.22227
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation9: Superior to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57.9 US tons
Inventory rating44.6 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length112 ft (34 m)
Longest span42 ft (12.8 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic49 (2023)
Projected traffic49 by 2043
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was T 110 over Center Creek built?

It was built in 2023, making it 2 years old in 2025.

What condition is T 110 over Center Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does T 110 over Center Creek carry?

About 49 vehicles per day (2023 count).

How long is T 110 over Center Creek?

The structure is 112 ft (34 m) long with a longest span of 42 ft (12.8 m) and a deck 31 ft wide.

Who owns T 110 over Center Creek?

It is owned by the Town or Township Highway Agency.