US Bridges

I 94 over TH 79

Fair

Douglas County, Minnesota · At the JCT of TH 79 · Structure no. 21802

Built
1963
62 years old, rebuilt 2017
Condition
Fair
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
152 ft
3 main spans
Daily traffic
5,250
2020 count
Owner
State
State Highway Agency

About this bridge

I 94 over TH 79 is a prestressed concrete stringer/multi-beam or girder carrying I 94 over TH 79 in Douglas County, Minnesota. It was built in 1963 and reconstructed in 2017, so it is 62 years old, older than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 5,250 vehicles a day, roughly 43% of them trucks, projected to reach 7,500 by 2040. The structure is 152 ft (46.4 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI 94
CrossesTH 79
LocationAt the JCT of TH 79
RouteInterstate 94
Coordinates45.99874, -95.73003
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating92.9 US tons
Inventory rating51.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length152 ft (46.4 m)
Longest span55 ft (16.7 m)
Deck width43 ft (13 m)
Roadway width39 ft (11.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,250 (2020)
Projected traffic7,500 by 2040
Trucks43%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I 94 over TH 79 built?

It was built in 1963, making it 62 years old in 2025. It was reconstructed in 2017.

What condition is I 94 over TH 79 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does I 94 over TH 79 carry?

About 5,250 vehicles per day (2020 count), of which roughly 43% are trucks.

How long is I 94 over TH 79?

The structure is 152 ft (46.4 m) long with a longest span of 55 ft (16.7 m) and a deck 43 ft wide.

Who owns I 94 over TH 79?

It is owned by the State Highway Agency.