US Bridges

T 22 over Stream

Fair

Dodge County, Minnesota · 0.6 MI E of JCT Csah 13 · Structure no. 20555

Built
2003
22 years old
Condition
Fair
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
114 ft
1 main span
Daily traffic
110
2002 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

T 22 over Stream is a prestressed concrete stringer/multi-beam or girder carrying T 22 over Stream in Dodge County, Minnesota. It was built in 2003, so it is 22 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 110 vehicles a day, projected to reach 110 by 2029. The structure is 114 ft (34.6 m) long and 39 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesT 22
CrossesStream
Location0.6 MI E of JCT Csah 13
RouteCounty Highway 22
Coordinates43.97895, -92.72485
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating79.6 US tons
Inventory rating46.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length114 ft (34.6 m)
Longest span107 ft (32.5 m)
Deck width39 ft (12 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic110 (2002)
Projected traffic110 by 2029
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was T 22 over Stream built?

It was built in 2003, making it 22 years old in 2025.

What condition is T 22 over Stream in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does T 22 over Stream carry?

About 110 vehicles per day (2002 count).

How long is T 22 over Stream?

The structure is 114 ft (34.6 m) long with a longest span of 107 ft (32.5 m) and a deck 39 ft wide.

Who owns T 22 over Stream?

It is owned by the Town or Township Highway Agency.