US Bridges

M 110 over North Creek

Good

Dakota County, Minnesota · 1100 Ft E of Gerdine Path · Structure no. 19565

Built
2012
13 years old
Condition
Good
inspected August 2023
Type
Frame
Concrete
Length
31 ft
1 main span
Daily traffic
200
2012 count
Owner
City
City or Municipal Highway Agency

About this bridge

M 110 over North Creek is a concrete frame carrying M 110 over North Creek in Dakota County, Minnesota. It was built in 2012, so it is 13 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 200 vehicles a day, projected to reach 200 by 2029. The structure is 31 ft (9.6 m) long and 35 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesM 110
CrossesNorth Creek
Location1100 Ft E of Gerdine Path
RouteCity Street 110
Coordinates44.70538, -93.20829
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating74.3 US tons
Inventory rating44.5 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length31 ft (9.6 m)
Longest span30 ft (9.1 m)
Deck width35 ft (10.8 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2012)
Projected traffic200 by 2029
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was M 110 over North Creek built?

It was built in 2012, making it 13 years old in 2025.

What condition is M 110 over North Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does M 110 over North Creek carry?

About 200 vehicles per day (2012 count).

How long is M 110 over North Creek?

The structure is 31 ft (9.6 m) long with a longest span of 30 ft (9.1 m) and a deck 35 ft wide.

Who owns M 110 over North Creek?

It is owned by the City or Municipal Highway Agency.