US Bridges

M 1 over Channel

Good

Dakota County, Minnesota · 0.2 MI NE of JCT TH 35 W · Structure no. 19564

Built
2012
13 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
75 ft
1 main span
Daily traffic
1,040
1987 count
Owner
City
City or Municipal Highway Agency

About this bridge

M 1 over Channel is a prestressed concrete stringer/multi-beam or girder carrying M 1 over Channel in Dakota County, Minnesota. It was built in 2012, so it is 13 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,040 vehicles a day, projected to reach 1,040 by 2029. The structure is 75 ft (23 m) long and 44 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesM 1
CrossesChannel
Location0.2 MI NE of JCT TH 35 W
RouteCity Street 1
Coordinates44.80085, -93.28432
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.2 US tons
Inventory rating40.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length75 ft (23 m)
Longest span74 ft (22.6 m)
Deck width44 ft (13.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,040 (1987)
Projected traffic1,040 by 2029
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was M 1 over Channel built?

It was built in 2012, making it 13 years old in 2025.

What condition is M 1 over Channel in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does M 1 over Channel carry?

About 1,040 vehicles per day (1987 count).

How long is M 1 over Channel?

The structure is 75 ft (23 m) long with a longest span of 74 ft (22.6 m) and a deck 44 ft wide.

Who owns M 1 over Channel?

It is owned by the City or Municipal Highway Agency.