US Bridges

T 102 over Cp Rail

Good

Dakota County, Minnesota · 0.1 MI E of JCT Csah 23 · Structure no. 19553

Built
2004
21 years old
Condition
Good
inspected December 2024
Type
Slab
Concrete Continuous
Length
146 ft
3 main spans
Daily traffic
60
2003 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

T 102 over Cp Rail is a concrete continuous slab carrying T 102 over Cp Rail in Dakota County, Minnesota. It was built in 2004, so it is 21 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 60 vehicles a day, projected to reach 60 by 2029. The structure is 146 ft (44.4 m) long and 35 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesT 102
CrossesCp Rail
Location0.1 MI E of JCT Csah 23
RouteCounty Highway 102
Coordinates44.56557, -93.20488
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating91.2 US tons
Inventory rating55.1 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 25 or greater
Structure length146 ft (44.4 m)
Longest span57 ft (17.4 m)
Deck width35 ft (10.8 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic60 (2003)
Projected traffic60 by 2029
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRailroad
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$1,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was T 102 over Cp Rail built?

It was built in 2004, making it 21 years old in 2025.

What condition is T 102 over Cp Rail in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does T 102 over Cp Rail carry?

About 60 vehicles per day (2003 count).

How long is T 102 over Cp Rail?

The structure is 146 ft (44.4 m) long with a longest span of 57 ft (17.4 m) and a deck 35 ft wide.

Who owns T 102 over Cp Rail?

It is owned by the Town or Township Highway Agency.