US Bridges

T 62 over Watonwan River

Good

Cottonwood County, Minnesota · 0.3 MI E of JCT CR 49 · Structure no. 17J04

Built
1996
29 years old
Condition
Good
inspected October 2022
Type
Culvert
Concrete
Length
36 ft
2 main spans
Daily traffic
22
1996 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

T 62 over Watonwan River is a concrete culvert carrying T 62 over Watonwan River in Cottonwood County, Minnesota. It was built in 1996, so it is 29 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 22 vehicles a day, projected to reach 22 by 2029. The structure is 36 ft (11 m) long. If it were closed, the detour would be 3.1 mi (5 km).

CarriesT 62
CrossesWatonwan River
Location0.3 MI E of JCT CR 49
RouteCounty Highway 62
Coordinates43.97773, -94.95383
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert8 Very GoodNo problems noted.
Last inspectionOctober 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.4 US tons
Inventory rating39.6 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 25 or greater
Structure length36 ft (11 m)
Longest span15 ft (4.5 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic22 (1996)
Projected traffic22 by 2029
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was T 62 over Watonwan River built?

It was built in 1996, making it 29 years old in 2025.

What condition is T 62 over Watonwan River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2022.

How much traffic does T 62 over Watonwan River carry?

About 22 vehicles per day (1996 count).

How long is T 62 over Watonwan River?

The structure is 36 ft (11 m) long with a longest span of 15 ft (4.5 m).

Who owns T 62 over Watonwan River?

It is owned by the Town or Township Highway Agency.