Mn 29 over Tcw Rail
GoodChippewa County, Minnesota · In Montevideo · Structure no. 12013
- Built
- 2017
- 8 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 179 ft
- 3 main spans
- Daily traffic
- 4,050
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
Mn 29 over Tcw Rail is a prestressed concrete stringer/multi-beam or girder carrying Mn 29 over Tcw Rail in Chippewa County, Minnesota. It was built in 2017, so it is 8 years old, younger than the Minnesota average of 38.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,050 vehicles a day, roughly 8% of them trucks, projected to reach 4,050 by 2038. The structure is 179 ft (54.7 m) long and 47 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Mn 29 over Tcw Rail built?
It was built in 2017, making it 8 years old in 2025.
What condition is Mn 29 over Tcw Rail in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does Mn 29 over Tcw Rail carry?
About 4,050 vehicles per day (2018 count), of which roughly 8% are trucks.
How long is Mn 29 over Tcw Rail?
The structure is 179 ft (54.7 m) long with a longest span of 65 ft (19.8 m) and a deck 47 ft wide.
Who owns Mn 29 over Tcw Rail?
It is owned by the State Highway Agency.