US Bridges

Msas 114 over Sand Creek

Good

Anoka County, Minnesota · 0.5 MI N of JCT Csah 11 · Structure no. 02J52

Built
2019
6 years old
Condition
Good
inspected October 2024
Type
Culvert
Concrete
Length
23 ft
2 main spans
Daily traffic
8,900
2016 count
Owner
City
City or Municipal Highway Agency

About this bridge

Msas 114 over Sand Creek is a concrete culvert carrying Msas 114 over Sand Creek in Anoka County, Minnesota. It was built in 2019, so it is 6 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,900 vehicles a day, projected to reach 10,300 by 2036. The structure is 23 ft (6.9 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesMsas 114
CrossesSand Creek
Location0.5 MI N of JCT Csah 11
RouteCity Street 114
Coordinates45.18423, -93.27561
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHL 93
Structure length23 ft (6.9 m)
Longest span11 ft (3.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,900 (2016)
Projected traffic10,300 by 2036
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Msas 114 over Sand Creek built?

It was built in 2019, making it 6 years old in 2025.

What condition is Msas 114 over Sand Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Msas 114 over Sand Creek carry?

About 8,900 vehicles per day (2016 count).

How long is Msas 114 over Sand Creek?

The structure is 23 ft (6.9 m) long with a longest span of 11 ft (3.4 m).

Who owns Msas 114 over Sand Creek?

It is owned by the City or Municipal Highway Agency.