US Bridges

Csah 32 over I 35W

Good

Anoka County, Minnesota · .6 MI N of JCT TH 35W; 10 · Structure no. 02571

Built
2006
19 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
316 ft
2 main spans
Daily traffic
12,203
2022 count
Owner
State
State Highway Agency

About this bridge

Csah 32 over I 35W is a prestressed concrete stringer/multi-beam or girder carrying Csah 32 over I 35W in Anoka County, Minnesota. It was built in 2006, so it is 19 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 12,203 vehicles a day, roughly 5% of them trucks, projected to reach 15,500 by 2042. The structure is 316 ft (96.2 m) long and 138 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCsah 32
CrossesI 35W
Location.6 MI N of JCT TH 35W; 10
RouteCounty Highway 32
Coordinates45.12442, -93.18857
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating109.8 US tons
Inventory rating44.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length316 ft (96.2 m)
Longest span156 ft (47.4 m)
Deck width138 ft (42.2 m)
Roadway width92 ft (28 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,203 (2022)
Projected traffic15,500 by 2042
Trucks5%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Csah 32 over I 35W built?

It was built in 2006, making it 19 years old in 2025.

What condition is Csah 32 over I 35W in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Csah 32 over I 35W carry?

About 12,203 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is Csah 32 over I 35W?

The structure is 316 ft (96.2 m) long with a longest span of 156 ft (47.4 m) and a deck 138 ft wide.

Who owns Csah 32 over I 35W?

It is owned by the State Highway Agency.