US Bridges

Csah 14 over Coon Creek; Weak Soil

Good

Anoka County, Minnesota · 0.5 MI E of JCT TH 10 · Structure no. 02015

Built
2002
23 years old
Condition
Good
inspected November 2023
Type
Slab
Concrete Continuous
Length
961 ft
38 main spans
Daily traffic
18,067
2019 count
Owner
County
County Highway Agency

About this bridge

Csah 14 over Coon Creek; Weak Soil is a concrete continuous slab carrying Csah 14 over Coon Creek; Weak Soil in Anoka County, Minnesota. It was built in 2002, so it is 23 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18,067 vehicles a day, roughly 1% of them trucks, projected to reach 17,506 by 2039. The structure is 961 ft (293 m) long and 105 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCsah 14
CrossesCoon Creek; Weak Soil
Location0.5 MI E of JCT TH 10
RouteCounty Highway 14
Coordinates45.19763, -93.32944
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating35.7 US tons
Inventory rating27.4 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans38
Design loadHS 25 or greater
Structure length961 ft (293 m)
Longest span39 ft (12 m)
Deck width105 ft (32 m)
Roadway width89 ft (27 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,067 (2019)
Projected traffic17,506 by 2039
Trucks1%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Csah 14 over Coon Creek; Weak Soil built?

It was built in 2002, making it 23 years old in 2025.

What condition is Csah 14 over Coon Creek; Weak Soil in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Csah 14 over Coon Creek; Weak Soil carry?

About 18,067 vehicles per day (2019 count), of which roughly 1% are trucks.

How long is Csah 14 over Coon Creek; Weak Soil?

The structure is 961 ft (293 m) long with a longest span of 39 ft (12 m) and a deck 105 ft wide.

Who owns Csah 14 over Coon Creek; Weak Soil?

It is owned by the County Highway Agency.