US Bridges

Sfr 52 over Hill River

Good

Aitkin County, Minnesota · At JCT Wiediger FR · Structure no. 01540

Built
2023
2 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
46 ft
1 main span
Daily traffic
1
2023 count
Owner
State
State Park, Forest, or Reservation Agency

About this bridge

Sfr 52 over Hill River is a steel stringer/multi-beam or girder carrying Sfr 52 over Hill River in Aitkin County, Minnesota. It was built in 2023, so it is 2 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1 vehicles a day, projected to reach 1 by 2043. The structure is 46 ft (14 m) long and 20 ft wide. If it were closed, the detour would be 11.2 mi (18 km).

CarriesSfr 52
CrossesHill River
LocationAt JCT Wiediger FR
RouteState Lands Road 52
Coordinates46.9578, -93.52785
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating52.9 US tons
Inventory rating40.7 US tons

Structure

MaterialSteel
DeckCorrugated steel
Main spans1
Design loadHL 93
Structure length46 ft (14 m)
Longest span46 ft (14 m)
Deck width20 ft (6.1 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1 (2023)
Projected traffic1 by 2043
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed11.2 mi (18 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Park, Forest, or Reservation Agency
Maintained byState Park, Forest, or Reservation Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Sfr 52 over Hill River built?

It was built in 2023, making it 2 years old in 2025.

What condition is Sfr 52 over Hill River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Sfr 52 over Hill River carry?

About 1 vehicles per day (2023 count).

How long is Sfr 52 over Hill River?

The structure is 46 ft (14 m) long with a longest span of 46 ft (14 m) and a deck 20 ft wide.

Who owns Sfr 52 over Hill River?

It is owned by the State Park, Forest, or Reservation Agency.