Plaza to I-96 WB over I-75 NB and Vernor Ramps
GoodWayne County, Michigan · Ambassador Gateway · Structure no. 000000000013400
- Built
- 2007
- 18 years old
- Condition
- Good
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 391 ft
- 3 main spans
- Daily traffic
- 1,100
- 2010 count
- Owner
- State
- State Highway Agency
About this bridge
Plaza to I-96 WB over I-75 NB and Vernor Ramps is a steel continuous stringer/multi-beam or girder carrying Plaza to I-96 WB over I-75 NB and Vernor Ramps in Wayne County, Michigan. It was built in 2007, so it is 18 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,100 vehicles a day, projected to reach 1,250 by 2030. The structure is 391 ft (119.1 m) long and 31 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Plaza to I-96 WB over I-75 NB and Vernor Ramps built?
It was built in 2007, making it 18 years old in 2025.
What condition is Plaza to I-96 WB over I-75 NB and Vernor Ramps in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does Plaza to I-96 WB over I-75 NB and Vernor Ramps carry?
About 1,100 vehicles per day (2010 count).
How long is Plaza to I-96 WB over I-75 NB and Vernor Ramps?
The structure is 391 ft (119.1 m) long with a longest span of 173 ft (52.6 m) and a deck 31 ft wide.
Who owns Plaza to I-96 WB over I-75 NB and Vernor Ramps?
It is owned by the State Highway Agency.