SB Rmp/Terminal DR over Lower Accs Rd&rogell DR
GoodWayne County, Michigan · Detroit Metro Airport · Structure no. 000000000012734
- Built
- 1997
- 28 years old
- Condition
- Good
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 200 ft
- 5 main spans
- Daily traffic
- 3,501
- 1996 count
- Owner
- Local
- Other Local Agency
About this bridge
SB Rmp/Terminal DR over Lower Accs Rd&rogell DR is a steel stringer/multi-beam or girder carrying SB Rmp/Terminal DR over Lower Accs Rd&rogell DR in Wayne County, Michigan. It was built in 1997, so it is 28 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,501 vehicles a day, roughly 1% of them trucks, projected to reach 4,026 by 2016. The structure is 200 ft (60.9 m) long and 35 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SB Rmp/Terminal DR over Lower Accs Rd&rogell DR built?
It was built in 1997, making it 28 years old in 2025.
What condition is SB Rmp/Terminal DR over Lower Accs Rd&rogell DR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does SB Rmp/Terminal DR over Lower Accs Rd&rogell DR carry?
About 3,501 vehicles per day (1996 count), of which roughly 1% are trucks.
How long is SB Rmp/Terminal DR over Lower Accs Rd&rogell DR?
The structure is 200 ft (60.9 m) long with a longest span of 60 ft (18.2 m) and a deck 35 ft wide.
Who owns SB Rmp/Terminal DR over Lower Accs Rd&rogell DR?
It is owned by the Other Local Agency.