Geddes Road over Sines Drain
FairWayne County, Michigan · Canton W/Canton Center · Structure no. 000000000012046
- Built
- 1997
- 28 years old
- Condition
- Fair
- inspected May 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 24 ft
- 1 main span
- Daily traffic
- 8,000
- 2017 count
- Owner
- County
- County Highway Agency
About this bridge
Geddes Road over Sines Drain is a prestressed concrete box beam or girders - multiple carrying Geddes Road over Sines Drain in Wayne County, Michigan. It was built in 1997, so it is 28 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,000 vehicles a day, roughly 3% of them trucks, projected to reach 13,100 by 2042. The structure is 24 ft (7.3 m) long and 44 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Geddes Road over Sines Drain built?
It was built in 1997, making it 28 years old in 2025.
What condition is Geddes Road over Sines Drain in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Geddes Road over Sines Drain carry?
About 8,000 vehicles per day (2017 count), of which roughly 3% are trucks.
How long is Geddes Road over Sines Drain?
The structure is 24 ft (7.3 m) long with a longest span of 20 ft (6.1 m) and a deck 44 ft wide.
Who owns Geddes Road over Sines Drain?
It is owned by the County Highway Agency.